Energy · 11/08Plant
150.6kWh
Peak power · 11/08Plant
17.49kW
Day's maximum, at 12:58 (Madrid time)
Generated since 25/06/2026Plant
7.245MWh
Sum of the measured daily energy · 46 of 48 days with data
CO₂ avoided · 11/08Plant
15.4kg
Emission factor: 0.102 kg CO₂eq/kWh — Spain's 2024 electricity generation mix (REE, 2024 Electricity System Report).
Data window: 05/08/2026, 00:00 — 12/08/2026, 00:00 (Madrid time)
The panels generate direct current (DC) and the inverter converts it into alternating current (AC) so it can be used on the grid. Some energy is lost in that conversion: that is why each day's AC bar is slightly lower than the DC one. The line below shows what fraction of the DC made it to AC (the conversion efficiency).
Up to the last day with data on either side.
Conversion efficiency over the window: 94.6% (across the 14 days with both sides measured and every string reporting).